Articles

Papers, Articles & Presentations by Paolo Gazzarrini

58th CGS Annual Conference

58th CGS Annual Conference

September 2005 | Saskatoon, SK

Case History of Jet-Grouting in British Columbia. Underpinning of CN Rail Tunnel in North Vancouver.

60 iest CGS Annual Conference

60 iest CGS Annual Conference

September 2007 | Edmonton, AB

Olympic Village – Jet-grouting.

62nd CGS Annual Conference

62nd CGS Annual Conference

September 2009 | Calgary, AB

Jet-Grouting for the Highbury Interceptor Siphon access chamber.

ISM 11th International Workshop

ISM 11th International Workshop

October 2012 | Milan, Italy

Use of real time monitoring for Micropiles/Anchor testing and stressing.

VGS 2013 Symposium

VGS 2013 Symposium

August 2013 | Vancouver, BC

Diaphragm Walls (Slurry Walls) – A solution for difficult soil conditions with presence of shallow water table.

ICOLD 2013

ICOLD 2013

August 2013 | Seattle, WA

John Hart Dam- Backup Jet-grouted Seepage Cutoff Wall Construction.

CDA Annual Conference 2013

CDA Annual Conference 2013

August 2013 | Montreal, QC

An approach to reducing a 3 m 3/sec leakage in a more than 100 meter high natural dam using Jet-Grouting Technology”. an P Eng- Steve Jungaro)

VRCA Awards

VRCA Awards

December 2006

Awards of excellence.